Dubai · Abu Dhabi · UAE

Concrete Cutting & Demolition Specialists

Diamond concrete cutting, core drilling and controlled demolition — GPR-mapped before every cut, DM-licensed, 95% first-call response.

12+ Years in UAE
1,500+ Core drills completed
85% Waste recycled
AED 5M Public liability cover
01 / CONCRETE CUTTING DUBAI LIBERTY BUILDING DEMOLITION · UAE
DM LicensedDEWA ApprovedISO 9001 : 2015OSHAD CompliantGPR Equipped
▸ 02 / WHY LIBERTY

Engineering-led. Not just labour.

01

GPR before every cut

Ground-penetrating radar maps every cut plane before the blade touches concrete. No surprises, no severed PT cables.

02

Structural engineer sign-off

Every G+1 project has a method statement stamped by a chartered structural engineer — required by DM, provided by us.

03

DM Licensed crews

Our operators are individually licensed for concrete cutting in the Dubai municipality — not just the company.

04

Dust and vibration control

HEPA-filtered extraction for indoor work, real-time vibration logging on sensitive sites. < 5 mm/s ppv on every recorded project.

05

85% waste recovery

Concrete waste is crushed and sorted on-site. Recycling certificates issued for LEED, Estidama and green-building compliance.

06

48-hour quote turnaround

Site visit on day 0, GPR scan on day 1–2, itemised quote by day 2. Faster for straightforward residential scope.

▸ 03 / PROJECTS

Recent work.

VILLA · 3,000 SQFT

Full Villa Demolition — Jumeirah

JUMEIRAH · DUBAI · 14 DAYS

HIGH-RISE · G+22

Podium Slab Core Drilling — Downtown

DOWNTOWN · DUBAI · 3 DAYS

INDUSTRIAL · 15,000 SQFT

Industrial Strip-out — Jebel Ali

JEBEL ALI · DUBAI · 21 DAYS

Liberty scanned, quoted, and cut a 3×2m opening in a 300mm post-tension slab in one day. No damage to PT cables, perfect finish.

Mohammed Al Rashidi Project Director, Rashidi Properties

We needed 120 core bores in a hospital slab on a live site. Liberty coordinated night shifts, maintained negative air pressure, and delivered zero downtime.

Anees Siddiqui MEP Contractor

Things clients ask first.

How quickly can you mobilise for a job in Dubai?

For standard work, we can mobilise within 24–48 hours of receiving a confirmed scope and access confirmation. Emergency same-day mobilisation is available for critical path situations.

Do you work in Abu Dhabi and Northern Emirates?

Yes. We operate across all seven emirates. Abu Dhabi is our second-largest market. Mobilisation fees vary by distance from Dubai base.

▸ 09 / CONTACT

Get a no-obligation site survey.

Reply within 1 business hour, on-site within 48 hours, itemised quote within 5 working days.

Direct channels

Talk to a project engineer.

WhatsApp is fastest for site photos & drawings. Calls answered 24/7 for emergency cutting.

Or email us directly at sohailghafoor@gmail.com

WhatsApp us Call now